The Assistant Electrical Engineer of the WSD, Mr LEUNG Chi-fung (right), briefs the two Secretaries on the photovoltaic system installed over Plover Cove Reservoir, which can generate as much as 120 000 units of electricity annually, equivalent to the annual electricity consumption of 36 average households and a reduction of 84 tonnes of carbon dioxide emissions each year. |
Close |