The SDEV, Mr Michael WONG (third left) pays a visit to a precast unit that has just been assembled. He sees that some essential fittings, partitions and fixtures (such as ceiling lights, floor tiles, windows and window grilles) are already in place.
The SDEV, Mr Michael WONG (third left) pays a visit to a precast unit that has just been assembled. He sees that some essential fittings, partitions and fixtures (such as ceiling lights, floor tiles, windows and window grilles) are already in place.
The SDEV, Mr Michael WONG (third left) pays a visit to a precast unit that has just been assembled. He sees that some essential fittings, partitions and fixtures (such as ceiling lights, floor tiles, windows and window grilles) are already in place.
Close