MiC adopts the concept of “factory assembly followed by on-site installation”, where freestanding modules, such as living rooms, bedrooms, kitchens, bathrooms, etc., are prefabricated in a factory and then transported to the site for installation like piling up building blocks with a view to minimising the duration of works on site. |
Close |