According to Engineer of the Port Works Division of the CEDD, Mr CHENG Cheuk-hin, the department has placed specially designed precast concrete units (commonly called dolosse) at the end portions of the breakwater at the Aberdeen South Typhoon Shelter to strengthen its structure. |
Close |