Kwu Tung (KTU) Station on the Lok Ma Chau Spur Line of the East Rail Line (ERL) will be built in Phase 1 of the NOL to serve the transport need of the Kwu Tung North (KTN) New Development Area (NDA). Pictured is the artist’s impression of the KTU Station. |
Close |